AI bid review for construction contractors

Drop in your bid package.
Get a full review in 15 minutes.

BidSnap reads every page of every spec book so you don't have to, then reviews the tender the way your company would bid it.

Start free

2,000 free credits. First deep dive free. No credit card.

TENDER REVIEW

PAGE 01 / 09

New Fernie Elementary School + Child Care

Earthwork & Grading, Underground Utilities contractor · Subcontractor Bid

Closing: June 23, 2026 at 2:00:01 p.m.

Project Overview

Our piece is the civil/site package: clearing and rough grading the entire site, mass excavation and Reinforced Structural Fill (RSF) preparation under the building4, all underground servicing from 1,000 mm outside the building wall to municipal mains7, foundation drainage, road and parking lot construction, curbs, sidewalks, topsoil placement, and mechanical seeding. The main technical risks driving pricing are soft clayey silt subgrade12, seasonal high groundwater13, and a specified RSF system under all footings.

24-076-Fernie_Elementary_School-A_S_L_C_IFT_Spec_Stamped.pdf · p. 14

Click to open the PDF at this page

Our Scope of Work

ItemSpecificationNotes
Topsoil stripping & stockpiling Stockpile max 2.5 m high per 31 10 00; max 2.0 m per 32 91 19.13. Use the more conservative 2.0 m. Do not excavate wet topsoil. Protect from erosion.
Mass excavation, building pad Subcut 0.45 m below footing elevation for RSF; remove fill, disturbed, or water-softened soils. Building footprint ~3,312 m²

Risk Summary · High Impact

RiskAction Required
Soft clayey silt subgrade (SPT 1-9) from ~2 m depth across the entire site12 RFI to clarify allowance for subgrade replacement; qualify excess as extra-to-contract.
Seasonal high groundwater (B2 = 1.75 m in Sept; spring peak higher)13 Get quote for dewatering plan; qualify dewatering scope explicitly.

An actual BidSnap deep dive review, written for the company that ran it.
Every fact is cited. Click one and BidSnap opens the source PDF at the exact page.

How it works

  1. 01

    Tell BidSnap what your company does.

    Five minutes, once. Every review is built around your trade, your capabilities, your size.

  2. 02

    Drop in the tender documents.

    Specs, drawings, geotech, addenda. It reads every page of text.

  3. 03

    Read the review. Ask follow-ups.

    Scope, risks, pricing considerations, deadlines. Then chat with the documents.

Pricing

Bid Snapshot

Is this tender worth your time?

about $1.50 per tender · ready in 2 minutes

Deep Dive

Everything you need to price it.

about $15 per tender · ready in 15 minutes

Pay per tender. No subscriptions. Credits never expire.

Try it on your next tender.

Start free